Sprints
Cycles (sprints)
Two-week iterations by default. Everything not finished rolls forward, with a reason.
Last updated 2026-03-12
A cycle in TechSync is what most teams call a sprint. By default:
- Duration: 2 weeks
- Start: Monday 00:00 local
- End: Friday 17:00 local (second week)
You can override this per team in Settings → Team → Cycles.
When a cycle ends, unfinished issues roll forward into the next cycle with a rollover reason required on each (dependency, scope, sickness, re-prioritised). The reasons surface in the cycle report.
{ "cycleLength": "2w", "startsOn": "mon", "autoroll": true }Was this helpful? Ask Sync in the widget if not — it'll escalate if it can't answer.