Two-week iterations by default. Everything not finished rolls forward, with a reason.

Last updated 2026-03-12

A cycle in TechSync is what most teams call a sprint. By default:

  • Duration: 2 weeks
  • Start: Monday 00:00 local
  • End: Friday 17:00 local (second week)

You can override this per team in Settings → Team → Cycles.

When a cycle ends, unfinished issues roll forward into the next cycle with a rollover reason required on each (dependency, scope, sickness, re-prioritised). The reasons surface in the cycle report.

{ "cycleLength": "2w", "startsOn": "mon", "autoroll": true }